Development finance calculator

Use a transparent drawdown model to test a development budget. Enter the cash advances you want, then see the debt at completion and whether it exceeds the leverage limits you assume.

Your scenario

Jump to results

Defaults are illustrative assumptions, not current rates or available offers. Figures stay on this page and are not sent to a lender.

Include professional, planning, selling, tax and legal costs as appropriate. Exclude finance fees entered below.

Illustration · GBP

Your result

Debt before exit fee£651,823
Equity contribution to project costs
£215,000
Total finance cost
£62,773
Profit before profit tax
£227,227
Cash advances over project
£595,000
Interest on staged drawdowns
£44,923
Repayment including exit fee
£657,773
Gross debt / entered costs (LTC)
80.5%
Gross debt / GDV (LTGDV)
59.3%
Headroom below your assumed debt cap
£36,677
Profit with GDV −10%, build +10%
£77,227

The LTC and LTGDV caps are your assumptions, not a lender's criteria. A positive margin does not establish viability.

Equal monthly drawdowns are an illustration. Your actual build schedule, equity timing and sales period can change the result.

Comparison lasts until you leave or refresh this page.

Month-by-month drawdown and interest schedule
Day-one debt and arrangement fee precede these build draws
MonthBuild drawInterestClosing debt
1£33,333£2,042£242,275
2£33,333£2,343£277,951
3£33,333£2,646£313,931
4£33,333£2,952£350,216
5£33,333£3,260£386,809
6£33,333£3,571£423,714
7£33,333£3,885£460,932
8£33,333£4,201£498,467
9£33,333£4,520£536,320
10£33,333£4,842£574,496
11£33,333£5,167£612,995
12£33,333£5,494£651,823

How this calculator works

Project costs = acquisition + build + other costs + contingency. Equity = those costs minus requested cash advances. It is a total funding contribution, not a prediction of when your cash will be required; lenders may require equity first.

The arrangement fee is added to the day-one balance. The build advance is drawn in equal amounts at the start of every month. Interest is then charged monthly on the outstanding balance, including previous interest and the financed fee. The full month-by-month schedule is shown.

Gross exposure before the exit fee is compared with both caps: entered project costs × assumed LTC, and GDV × assumed LTGDV. A negative headroom is a funding gap under your own assumptions, not a lending decline. Lenders define eligible costs and gross facilities differently.

Exit fee is charged on cash advances. Profit is GDV less the entered project budget and all modelled finance costs, before profit tax. The downside reduces GDV by 10% and adds 10% of the build budget as a further overrun beyond the entered contingency, with no extra debt assumed.

A worked example

With a £100,000 day-one advance and £120,000 drawn evenly over 12 months, there are twelve £10,000 build advances. At 0% with no fees, completion debt is £220,000. At a positive rolled rate, charging interest on the whole facility from day one would overstate this particular drawdown model.

What the result cannot tell you

The equal-draw model excludes retention deductions, staged sales, a separate sales period, monitoring-surveyor fees unless budgeted, day-one LTV restrictions and lender-specific interest reserves. Exit fees may instead be based on GDV. Delays increase interest and can require more equity. This is not a feasibility valuation, finance offer or assessment of planning permission or developer experience.

Results are rounded for display; calculations use unrounded figures. A lender’s payment calendar, daily interest and rounding can produce different figures.

Put the numbers in context

Development finance: works, drawdowns and exit Development exit finance after completion Compare a bridging structure

TFP’s contact and introduction service is not open yet. You can use these tools without an enquiry. Get an appropriately qualified or authorised adviser’s help where the decision needs it.

Sources and responsibility

Published by The Finance Place. Methodology updated . The calculations are TFP illustrations; the sources explain the products and risks and do not validate a lending decision. No independent professional review is claimed.

Editorial and calculation standards

Important information and the current service status